Fugitive Dust Control Plan Utah: Rules & Water Truck Cost

Key Takeaways

  • The trigger is a quarter acre — about 10,890 square feet, roughly 100 by 110 feet. Not one acre. R307-309-6.
  • The rule covers parts of seven counties — all of Utah County and all of Salt Lake County among them, with no city-level carve-out.
  • The plan must be approved before you disturb ground. The online tool approves itself; paper "may take up to 14 days."
  • The DAQ form lists 21 activities, and two are mandatory on every project: 09 (disturbed soil) and 18 (trackout).
  • The rule never names a water truck. Watering is one of four stabilization options — and the only one that survives daily equipment traffic.
  • Live rates in American Fork: $150/day for a 500-gallon water trailer, $550/day for 2,000 gallons, $900/day for 4,000 gallons, $170/day for a skid steer sweeper attachment.
  • Penalties run through a notice of violation and a corrective action order, ceiling $10,000 per day per violation (Utah Code 19-2-115). Keep records two years.
4,000-gallon water truck parked on a dirt haul road for construction dust control

If you are clearing, grading or excavating a quarter acre or more anywhere in Utah County or Salt Lake County, you need an approved fugitive dust control plan on file with the Utah Division of Air Quality before you break ground. A quarter acre — not one acre — and approved first, not filed later.

Most contractors caught out by this rule were not cutting corners. They were measuring against the one-acre stormwater threshold, which is a different filing, to a different division, controlling a different thing.


Does Utah's fugitive dust rule apply to my site?

Two tests — size and location — and you need both to be inside the rule; fail either one and you are outside it. R307-309-3 applies the rule to "all new or existing sources of fugitive dust one-quarter acre or greater" in PM10 or PM2.5 nonattainment and maintenance areas. Then it names the geography, which is the part nobody quotes:

"all regions of Salt Lake and Davis counties; all portions of the Cache Valley; all regions in Weber County west of the Wasatch mountain range; all regions of Utah County..."

Unqualified. No sub-county boundary to check, no city sitting outside: American Fork, Lehi, Pleasant Grove, Provo, Orem, Saratoga Springs, Eagle Mountain, Draper, Sandy, West Jordan and Salt Lake City are all in. DAQ's program page lists the covered counties as Box Elder, Cache, Davis, Salt Lake, Tooele, Utah and Weber, so the rule does not reach the whole state — a dig in St. George, Moab or Vernal is outside these areas. On the Wasatch Front, stop looking for the local exemption.

The size test. A quarter acre is 10,890 square feet: picture 100 by 110 feet. That is a large residential lot, a small commercial pad, or a driveway plus a back-yard regrade taken together, which is why the rule keeps catching people who aren't full-time site contractors. If a regrade is your project, our yard grading equipment guide covers the machine side.

The exemptions, per R307-309-3(2): agricultural operations as defined under state law, and activities under R307-307, road salting and sanding. No homeowner exemption, no owner-builder exemption, no "it's only a few days" exemption.

A quarter acre for dust, an acre for stormwater — two different filings

Fugitive dust control plan Stormwater permit (SWPPP)
Trigger 1/4 acre of disturbance 1 acre of disturbance
Filed with Division of Air Quality Division of Water Quality
Controls Dust leaving your site through the air Sediment leaving in runoff
Best for knowing Every job at or above 1/4 acre Jobs at 1 acre — which need the dust plan too

Cross an acre and you need both filings. This confusion is the source of nearly every wrong number circulating on the subject. Lehi City's fugitive dust page is the clearest local write-up of both thresholds in one place.


It is a plan, not a permit — and here is how you get one

People search for a "Utah dust control permit," and the state's own instruction sheet slips and calls it one. It isn't. R307-309-6 requires anyone "clearing or leveling of land one-quarter acre or greater in size" to "submit a fugitive dust control plan on a form provided by the director" — and the director is the director of the Division of Air Quality. Not your city, not the county health department, not Utah County. Your city may want its own grading permit; the dust plan is a state filing, and "activities regulated by R307-309 shall not commence before the fugitive dust control plan is approved by the director."

Route How approval works Lead time Best for
Online tool "Successful completion of the web-based division-sponsored fugitive dust control plan tool shall constitute plan approval" One sitting Almost everyone
Hard copy Must be "reviewed and approved by the director prior to commencing activities" DAQ warns it "may take up to 14 days from the date of request" Projects that cannot use the web form

That first row kills the usual objection that compliance means waiting on a government queue. But there is a catch nobody publishes: DAQ's instruction sheet says "the application does not have the capability of saving partial plans," and you cannot edit a submitted plan inside the tool — changes mean contacting DAQ directly or submitting an entirely new application. Gather everything before you start — applicant type, site address and county, total acreage, latitude and longitude, project point of contact, on-site superintendent.


What R307-309 obligates you to do once the plan is approved

The plan is not a statement of intent. It is a list of measures you commit to, and R307-309-12 makes them auditable for two years.

You check activities from a 21-item list — backfilling, blasting, clearing, cut and fill, demolition, disturbed soil, hauling, paving, sawing, screening, staging, stockpiling, tailings, trackout, traffic, trenching, truck loading, and the rest.

Two of the 21 are not optional. The form's own words, capitals included:

Activity 09 — "Disturbed soil throughout project including between structures. THIS ACTIVITY MUST BE SELECTED FOR ALL PROJECTS."

Activity 18 — "Trackout Prevention and Cleanup of mud, silt and soil tracked out onto paved roads. (THIS ACTIVITY MUST BE SELECTED FOR ALL PROJECTS.)"

No size qualifier, no project-type qualifier. Every plan, every time. Then each checked activity opens a best-management-practice page, and most of them say "MAKE AT LEAST ONE SELECTION FROM EACH SECTION." You are picking named measures from menus, and each pick is something an inspector can hold you to. The two sections below are that mandatory pair.


Disturbed soil: four ways to stabilize it, and why water wins on an active site

4,000-gallon water truck, the BMP 09-03 measure for keeping disturbed soil at working moisture

The rule does not require a water truck. It requires you to stabilize disturbed soil and keep it stable. BMP 09 carries two required sections, and the first is the cheap one: "Limit disturbance of soils where possible," offering 09-01 fencing, barriers or wind barriers, or 09-02 "Limit vehicle mileage and reduce speed," which costs nothing at all. Make a selection there before you price anything. The second section is stabilization, and it offers exactly four ways.

Code Measure Best for Why it struggles on an active site
09-03 "Apply water to stabilize disturbed soils. Soil moisture must be maintained such that soils can be worked without generating fugitive dust." Ground worked daily Needs a water source and repeated passes
09-04 "Apply and maintain a chemical stabilizer." Haul roads and pads that stay put A crust you drive across is a crust you destroy
09-05 "Use wind breaks." Stockpiles and perimeters Does nothing about dust thrown up by traffic
09-06 "Apply cover (natural or synthetic)." Stockpiles, areas going dormant You cannot tarp ground equipment crosses

Read the right-hand column and the answer arrives without anyone selling you anything: on ground you drive across every day, water is the only measure that keeps working. Note 09-03's standard is a continuous condition, not a morning task.

Two honest footnotes. The form's named chemical stabilizers include magnesium chloride, calcium chloride and lime, all three flagged as measures that "should not be used near surface water bodies or drainage areas" — and Alpine Equipment stocks no stabilizers, tarps or gravel, so 09-04 and 09-06 send you to a materials supplier rather than to us. And if a tract is going quiet for a month, BMP 10 allows long-term stabilization with vegetation, where a Harley rake attachment at $170/day or $495/week beats another watering pass. Compaction is usually why you were watering; the stabilization menu does not list compacting, so don't write a roller into your plan as the dust answer.


Trackout: the mandatory BMP nobody explains

Trackout is the mud, silt and soil your tires carry onto the paved road, and the form makes it mandatory on every project. R307-309-8 covers anyone moving "trucks or construction equipment over cleared land or access haul roads," who "shall prevent, to the maximum extent possible... material from being deposited onto any paved road other than a designated deposit site," and who "deposits materials that may create fugitive dust on a public or private paved road shall clean the road promptly." R307-309-9 repeats that duty for any existing road, with a further subsection aimed at unpaved roads and at deposit onto the paved roads they intersect.

Now read the top of BMP 18's prevention menu literally. 18-01: "Clean trackout at the end of the work shift from paved surfaces to maintain dust control." 18-02: "Maintain dust control during working hours and clean trackout from paved surfaces at the end of the work shift/day." Whichever you pick, you have committed in an approved plan to cleaning the paved road at the end of every shift — a daily obligation, and the part crews forget until someone complains.

Code Measure What it takes Best for
18-01 Clean trackout at end of shift A sweeper, daily The default pick, and the one most plans carry
18-02 Control during hours and clean at end of shift Sweeper plus in-shift attention Busy exits, steady truck traffic
18-03 Gravel pad, well-graded rock, topped up Material and placement, supplier priced One entrance you build once
18-04 Wheel shakers, cleaned regularly Purchased or fabricated device Long jobs, heavy haul-out
18-05 Wheel washers, maintained regularly Device, water supply, runoff control Wet-material and heavy-mud work
18-06 "Motorized vehicles will only operate on paved surfaces" Nothing — a site rule Paving, demolition, repair
18-07 Cattle guard before the paved entrance Purchased, installed device Rural approaches, long-term access

The 18-03 spec is worth quoting exactly, because you can act on it today: gravel pads must be "minimum... 30 feet wide by 3 inches deep, and, at minimum, 50' or the length of the longest haul truck, whichever is greater." Alpine sells no gravel — take that number to your rock supplier. A second required section then heads off the obvious dodge: "All exiting traffic must be routed over selected trackout control device(s)," with 18-08 committing you to enforce that traffic pattern and 18-09 to barricade the rest. A gravel pad nobody drives over fails an inspection.

The shift-end sweep, priced

We could not find a Utah company publishing a rate for the equipment a shift-end sweep takes. Here are two.

Machine Day Week 28-Day Best for
3-Wheel Ride-On Sweeper $375 $1,300 $2,650 Long paved runs and street frontage, no skid steer on site
Skid Steer Sweeper/Broom Attachment $170 $495 $1,175 Any crew already running a skid steer

The second row is the sharp one: a crew already on a skid steer adds shift-end road cleanup for $170/day, or $495 for the week. Rates exclude delivery. Our guide to commercial property maintenance equipment in Utah County covers the sweeper-and-water pairing year-round.

And the free measure, because not every answer is a machine: BMP 19 lets you limit vehicle speed on unpaved routes, and BMP 11 for hauling names 11-05 "clean wheels" and 11-06 "sweep or water haul road." Slowing your haul trucks cuts both dust generation and what lands on the pavement, so do that before renting anything.


Sizing the water: three rungs, real rates, and the CDL question

Multiquip 500-gallon towable water trailer, rung 1 of the Utah dust control water ladder at $150 a day

Most pages on this subject show one truck. There are three rungs, and a quarter-acre lot that barely trips the rule does not need a $900-a-day truck. It needs $150 a day and a pickup with a hitch.

Rung Machine Day Week 28-Day CDL question Best for
1 500-Gallon Water Trailer $150 $450 $1,250 None — trailer and pickup stay under the weight thresholds Lots, ADU pads, single-family regrades
2 2,000-Gallon Water Truck $550 $1,575 $3,950 Almost certainly Class B — confirm GVWR Basement digs, small subdivisions
3 4,000-Gallon Water Truck $900 $2,700 $6,500 Almost certainly Class B — confirm GVWR Multi-acre grading, long haul roads

Terms, once and plainly: rates exclude delivery, delivery is $165/hour, and rental and delivery carry a four-hour minimum. Standalone hauling is quoted per job. And the item that decides more jobs than any rate above — the renter supplies the water. The water truck rental page lists what is on the yard in American Fork.

Do you need a CDL to drive a water truck?

2,000-gallon water truck on a Utah job site — around 16,700 pounds of water, so plan on a Class B

It turns on the specific unit's gross vehicle weight rating, not tank size — and for both trucks above the honest answer is "almost certainly yes, confirm before you plan your crew." The Utah Driver License Division's CDL page puts Classes A and B at "a gross vehicle weight rating of 26,001 pounds or more," with Class A requiring a towed unit of 10,001 pounds or more and Class B carrying either no towed unit or one under that figure. Water weighs about 8.34 pounds per gallon, so 2,000 gallons is roughly 16,700 pounds of water alone and 4,000 gallons roughly 33,400 pounds before the chassis. The N tanker endorsement, on the same page, covers tanks over 1,000 gallons in aggregate, but only bites on a vehicle that already needs a CDL.

The 500-gallon trailer sidesteps the question on weight, not because it is towed. Towing is what raises a Class A question in the first place: DLD defines a commercial motor vehicle by a 26,001-pound GVWR or a 26,001-pound gross combination weight rating including a towed unit rated over 10,001 pounds. Five hundred gallons is about 4,170 pounds of water, so the trailer stays well under 10,001 pounds and the pickup-and-trailer combination well under 26,001 — scale the same hitch up to a big towed tank and the question comes back. If your whole problem is that nobody on the crew holds a Class B, rung 1 is the answer rather than a compromise, and small-site work like an ADU pad rarely needs more.

How long does a tank last?

We are not publishing a gallons-per-acre figure, and be suspicious of anyone who does. The only citable published application rate we could find is an EPA emission-modeling convention — the water equivalent of a hundredth of an inch of rain — never meant as a dust-control recommendation.

The number that decides your truck size is refill trips per shift. Work out how far your legal water source is, how long a fill takes, and how many round trips your crew can absorb before the truck costs you production instead of buying you compliance. A hydrant is not a free tap: many cities require a hydrant meter permit for construction draws, so ask yours and have a backup fill point. If your only source is fifteen minutes out, the $900/day truck can be the cheaper truck once you count the crew standing idle while a $550 one spends half the shift driving.


Opacity, wind over 25 mph, and what happens when the neighbors call

R307-309-5 sets the visual standard: 10% opacity at the property boundary, 20% on site. Opacity is a trained visual reading, not an instrument measurement, so translate it: an inspector at your fence line is judging whether dust crossing that line obscures what is behind it.

The wind exception, both halves. Above 25 mph, measured by anemometer rather than estimated, the opacity limits do not apply — but only while you are operating under an accepted plan and implementing contingency measures, which the rule names as pre-event watering, hourly watering, additional chemical stabilization, or ceasing or reducing operations. "Hourly watering" is the rule's language, not ours, and a high-wind day is when you find out whether your plan had contingency measures in it.

How enforcement starts. Not with a patrol. Lehi City documents the sequence: a complaint comes in, "DAQ will first call and issue a warning to the developer. If the complaint continues, they will perform a site visit without notice." Lehi's page is also clear that "the DAQ is the entity responsible for monitoring and enforcing the Fugitive Dust Plan," and that "Lehi City has no more leverage than a citizen to file a fugitive dust complaint." So the trigger is a neighbor with a phone — digging beside occupied homes in Lehi, Saratoga Springs or Draper, your exposure has nothing to do with inspector headcount.

What follows. Under Utah Code 19-2-110 the director may serve written notice of a violation, which "may include an order that necessary corrective action be taken within a reasonable time." Utah Code 19-2-115 sets the civil penalty ceiling at "not to exceed $10,000 per day for each violation" — a statutory maximum, not a typical outcome, and we found no published schedule of assessed amounts for construction dust in Utah County.

A second layer in Salt Lake County. Work inside the county also sits under county Code 9.72.150, which requires "reasonable precautions to prevent particulate matter from becoming airborne" and prohibits fugitive particulate "visible beyond the property line of the emission source" — stricter in kind than the state's opacity threshold. Whether the county enforces 9.72 alongside DAQ is something we could not verify, so treat it as an obligation to know rather than a second inspector to expect.


Records: two years of proof

R307-309-12 requires sources subject to R307-309-5(2) and (3) to "maintain records for two years demonstrating compliance," available to the director on request. The measures you selected are the checklist you will be asked to evidence:

  • A watering log — dates, areas covered, what you did on high-wind days
  • A trackout log — shift-end sweeps, and when the gravel pad was topped up
  • Rental and delivery paperwork showing equipment on site during the disturbance window
  • The approved plan itself, where the superintendent can produce it

Three Utah projects, priced

A grading contractor on a subdivision phase in Saratoga Springs. Six weeks of earthwork, a haul road, a paved approach onto a public street. The 4,000-gallon truck fits the acreage and the wind exposure, but the term matters more than the rate: six weekly rentals at $2,700 come to $16,200, while a 28-day term at $6,500 plus two weeks at $2,700 comes to $11,900 — matching the term to the disturbance window saves $4,300 on the same machine. Add the sweeper attachment at $495/week so the crew can clear the road at end of shift rather than after a phone call, and budget delivery at $165/hour with a four-hour minimum.

A homeowner regrading a lot and driveway in Pleasant Grove. Five working days with a mini excavator and a skid steer. Say the regrade and the driveway together disturb 0.4 acre — 17,424 square feet, well past the quarter-acre trigger, so the plan needs approval before the machine turns dirt. This job is inside the rule and almost nobody in this position knows it. The 500-gallon trailer is the answer — five days at $150 is $750, the week rate is $450, so take the week and pocket the $300. No CDL question at this weight, and it tows behind a pickup; ask us for the hitch and tongue requirements on the exact unit before you plan the tow.

A small builder on an ADU and basement dig in Draper. Three weeks, tight lot, occupied homes both sides. The 2,000-gallon truck covers the disturbed area, and the term argument repeats itself here on a smaller machine: three weeks at $1,575/week is $4,725, while the 28-day rate is $3,950 — the longer term is the cheaper buy, so take the 28 days and stop counting weeks. The real exposure is trackout onto a residential street, because the neighbors are the enforcement trigger. Draper is in Salt Lake County, so Code 9.72 applies on top of the state rule. Budget the sweeper attachment alongside the water and you have the equipment both mandatory BMPs call for — the daily watering and the shift-end sweep still have to actually happen, and be logged. We deliver across Salt Lake County from American Fork.


How to evaluate any rental company for dust-control equipment

Run these on whoever you rent from, us included. The point is not to arrive at Alpine — it is to stop you signing for a truck that cannot do what your plan committed you to.

  1. Does the day rate include delivery, and how is delivery billed? Ours: rates exclude delivery, delivery is $165/hour, and rental and delivery carry a four-hour minimum.
  2. Who supplies the water, and where is the nearest legal fill? Nearly everyone answers "you do," so the real question is distance — and whether your city wants a hydrant meter permit.
  3. What is the GVWR on the exact unit, not the model? The CDL answer is a number on a plate, not a category.
  4. Is there a towed option? With no Class B on the crew, a 500-gallon trailer turns an impossible rental into a possible one.
  5. If the truck goes down mid-shift, who fixes it and how fast? An idle water truck on a windy afternoon is how an opacity problem starts, and it has a visible signature. Ask whether the company has its own technicians or subs the work out — Alpine's fleet is serviced in-house in American Fork, which is the one reason our service side belongs in a post about dust.
  6. Can the term match my disturbance window? Day, week and 28-day should all be quotable, and 28 days should beat four weeks.
  7. Will the pump and spray bar be demonstrated at handover? A spray bar nobody showed your operator is a truck that gets used as a hose.

What we cannot do

  • We do not file your plan and cannot approve it. DAQ does both, and any rental company implying otherwise is telling you something untrue.
  • We do not supply water, and we do not sort out your hydrant meter permit.
  • We cannot tell you whether your parcel crosses a quarter acre. That comes off your site plan or survey.
  • We stock no gravel, wheel shakers, wheel washers or cattle guard — four of BMP 18's seven trackout measures (18-03, 18-04, 18-05, 18-07) are not rental equipment at all. Nor do we stock chemical stabilizer, which sits under BMP 09 for disturbed soil.
  • We rent machines; the crew is yours. With no Class B on the crew and a 4,000-gallon need, a dust-control service arriving with its own driver beats any bare rental, ours included.
  • We work from one yard, in American Fork. For a job in the Uintah Basin or southern Utah, a company with a closer yard beats us on delivery cost and response time; one Utah competitor lists a Roosevelt office address.
  • Our water fleet is short at the top rungs. Three trucks at once for a month may suit a national chain's fleet depth better — their trade-off is that they publish no local rates, and in our experience getting a GVWR for a named unit out of them before you commit is hard work.

Frequently Asked Questions About Utah's Fugitive Dust Rule

Do I need a dust control plan in Utah?
You need one if your project will disturb a quarter acre or more in a covered area — all of Utah County, all of Salt Lake and Davis counties, the Cache Valley, western Weber County, and parts of Box Elder and Tooele counties. The only exemptions are agricultural operations under state law and road salting and sanding under R307-307.

What is a fugitive dust control plan?
It is a plan filed with the Utah Division of Air Quality on a state form, selecting the dust-generating activities on your site and committing to named best management practices for each. It is a plan, not a permit, and the online version approves itself on completion.

How big does a site have to be to need a dust control plan?
A quarter acre of disturbance — about 10,890 square feet, or roughly 100 by 110 feet — per R307-309-6. The measurement worth getting right is what the figure applies to: the rule counts ground you disturb, not ground you own. A two-acre parcel with 8,000 square feet of grading on it is outside the trigger; a quarter-acre lot stripped corner to corner is inside. Take the number off your site plan or survey rather than off the deed.

Is a fugitive dust control plan the same as a stormwater permit?
No — two separate filings with two different divisions. The dust plan goes to the Division of Air Quality at a quarter acre of disturbance; the stormwater permit (SWPPP) goes to the Division of Water Quality at one acre, so a one-acre job needs both.

How do I get a fugitive dust control plan in Utah?
Complete DAQ's web-based fugitive dust control plan tool, because the rule states that successful completion of that tool constitutes plan approval. Gather your site address, county, acreage, latitude and longitude, point of contact and on-site superintendent first — the application cannot save partial plans, and once you submit you cannot edit inside the tool — a change means contacting DAQ or starting a new application.

How long does it take to get a dust control plan approved?
Online, one sitting — completing the web tool is the approval. On paper, DAQ warns it "may take up to 14 days from the date of request to receive an acceptance," and either way approval must precede ground disturbance.

What is the fine for fugitive dust in Utah?
Utah Code 19-2-115 sets a civil penalty ceiling of not more than $10,000 per day for each violation, which is a statutory maximum rather than a typical assessment. In practice a complaint produces a warning call first, then an unannounced site visit, and the statutory instruments are a notice of violation and a corrective action order under 19-2-110.

Do I need a water truck for dust control?
No. The rule asks for stabilized soil, not a truck, and the stabilization table above sets out all four permitted measures with the reason three of them fail on ground equipment crosses daily. Water usually wins on an active site by elimination, not by preference. And if water is your pick, tank size is a capacity decision rather than a compliance one — a 500-gallon trailer at $150/day wets the same ground a $900/day truck does, it just needs refilling sooner.

Do you need a CDL to drive a water truck?
It depends on the gross vehicle weight rating of the exact unit, not on tank size. Utah puts Classes A and B at 26,001 pounds GVWR or more, and the water-weight math above puts both the 2,000- and 4,000-gallon trucks almost certainly inside that, so plan on a Class B and confirm the rating off the unit's own plate before you assign a driver. A tank over 1,000 gallons in aggregate brings the N endorsement in on top of that, though only once the vehicle needs a CDL at all. The 500-gallon trailer clears every one of these thresholds on weight, which is why rung 1 solves a crew problem as well as a budget one.

How much does it cost to rent a water truck in Utah?
At Alpine Equipment in American Fork, day rates are $150 for a 500-gallon water trailer, $550 for a 2,000-gallon truck and $900 for a 4,000-gallon truck. Week and 28-day rates are in the three-rung table above, and the pattern to notice there is that on anything past three weeks the 28-day rate beats stacking weekly rentals — on the 2,000-gallon truck that is $3,950 against $4,725. Rates exclude delivery, which is $165/hour with a four-hour minimum on rental and delivery, and the renter supplies the water.

Who do I call about construction dust in my neighborhood?
The Utah Division of Air Quality, the agency that monitors and enforces fugitive dust control plans — not your city. Lehi City states on its own page that it "has no more leverage than a citizen to file a fugitive dust complaint," and per Lehi, DAQ first calls the developer with a warning, then visits without notice if complaints continue.

Does the dust rule apply to homeowners?
Yes, if you disturb a quarter acre or more in a covered area — R307-309 keys on the activity and the acreage, not on whether you hold a contractor's license. A large lot regrade, or an ADU pad and basement dig, can cross 10,890 square feet quickly, and there is no owner-builder exemption in R307-309-3(2).


Getting dust control right in Utah County and Salt Lake County

A quarter acre. Approved by the Division of Air Quality before you break ground. Disturbed soil and trackout on every plan, no exceptions. The version circulating in most places — one acre, filed with the county — gets all three wrong.

After approval the work is equipment and habit: keep the soil at working moisture, keep the pavement clean at end of shift, log both, and have a contingency ready for the day the wind comes up. On a small lot that is a $150/day trailer and a broom; on a multi-acre grade it is a truck, a sweeper, and a term that matches the window.

Alpine Equipment is based in American Fork and delivers water trucks, water trailers and sweepers across Utah County and Salt Lake County, with our own technicians keeping the fleet running. If you already know the rung you need, see what is on the yard and what it costs by the day, week and 28 days. If the shift-end sweep is the part you have not solved, the skid steer sweeper attachment is $170/day and rides on the machine you already have. And if you are still choosing between rungs, send the rental desk your acreage and your disturbance window — if the honest answer is the cheaper rung, we will say so.